I agree, do the walls first to avoid walking and dropping mud or Mastic on the new floor, leaving out the bottom row, then do the floor and cut the bottom wall cuts to the floor and leave just enough room to grout. One other tip, if you are doing a tub surround, don't grout between the tub and tile, it will crack no matter what, instead, fill the tub with water, caulk around the tub and don't drain it for at least 24 hours. |